Rows of enclosed electrical switchgear cabinets in a commercial electrical room
SPECIALISM 02 / 06 — ELECTRICAL

Power with purpose.
Every circuit considered.

Thoughtful electrical engineering from load assessment to final circuit commissioning.

Enquire about this service ↗
ENGINEERING THE INVISIBLE.SCROLL TO EXPLORE ↓DESIGN / BUILD / DELIVER
02 / ELECTRICAL

Electrical Systems.

Power designed for the way buildings perform.

Thoughtful electrical engineering from load assessment to final circuit commissioning. Our role is to align system performance, spatial coordination and project delivery expectations from the start.

DISCUSS ELECTRICAL SYSTEMS ↗
02 / DESIGN + DELIVERY

What we cover.

A coordinated scope developed around the project brief and agreed deliverables.

01

Load schedules, demand assessments and SLDs

02

LT distribution and panel board layouts

03

Power cabling, containment and cable-tray routing

04

Lighting and emergency-lighting coordination

05

Earthing, bonding and lightning protection

06

UPS, DG interface and power-quality planning

Rows of enclosed electrical switchgear cabinets in a commercial electrical room

A CLOSER LOOK / ELECTRICAL

03 / PROJECT OUTPUTS

Clarity you can
build from.

01

Load calculations and SLDs

Reviewed and coordinated against the agreed project scope, documentation stage and site requirements.

02

Lighting, power and containment drawings

Reviewed and coordinated against the agreed project scope, documentation stage and site requirements.

03

Panel and cable schedules

Reviewed and coordinated against the agreed project scope, documentation stage and site requirements.

04

BOQs, test and inspection checklists

Reviewed and coordinated against the agreed project scope, documentation stage and site requirements.

04 / PROJECT PARTNERS

Two perspectives.
One shared goal.

FOR ARCHITECTS / DESIGN TEAMS

Protecting the intent.

Lighting, visible devices, risers and electrical-room allowances are aligned with the design narrative.

DISCUSS DESIGN COORDINATION ↗
FOR PMCs / PROJECT TEAMS

Making delivery visible.

Equipment submittals, inspection checkpoints, circuit labelling and energisation readiness.

DISCUSS PROJECT DELIVERY ↗
05 / TECHNICAL QUESTIONS

Useful answers.
Before we begin.

Final engineering specifications and authority requirements are project-specific.

Do you handle both lighting and power infrastructure?

Yes. The design-build scope can include lighting, distribution, cable containment, equipment interfaces and associated electrical infrastructure.

How is electrical coordination managed?

Through coordinated layouts, schedules, approved shop drawings and site-stage quality checks with the architect and PMC.